University of Ubudiyah Indonesia Aceh
Entrepreneur Lecture Program Diy (Hybrid / Blended) - Universitas Ubudiyah Indonesia
Select    Indonesia English
Show  laptop iconLaptop  Mobile1, 2
Register Online
Get the Scholarship Info
eduNitas.com
Perubahan Dimulai Dari #BeraniKuliah
HOME- Essence
OBJECTIVES
NEW STUDENT ADMISSION
COST OF EDUCATION
DOWNLOAD ADMISSION
ALL INFORMATION
APPLICATION SCHOLARSHIPS
ONLINE REGISTRATION
REQUEST BROCHURES - FREE
EXCELLENCE
DEPARTMENT *COMPLETE
INFO SERVICES
SELECTION SYSTEM

LIST SCHOLARSHIP RECIPIENTS
MAJOR (CURRICULUM)
CAREER PROSPECTS ALUMNUS

GOVERNMENT & 1945 CONSTITUTION SUPPORTING ENTREPRENEUR LECTURE DIY (HYBRID / BLENDED)

LECTURE SYSTEM
LECTURER & LECTURE SCHEDULE
CAMPUS LOCATION MAP
PUBLIC TRANSPORTATION
PHOTO GALLERY
Wise Solutions
Improvement Income or Obtaining New Jobs

Website Network (Web List)
Universitas Ubudiyah Indonesia

Employee Class Web
Evening Class Web
Main Websites



Campus Ubudiyah: Jl. Alue Naga, Kec. Syiah Kuala Desa Tibang, Banda Aceh Indonesia
    ⌺ Mobile / SMS / WA, Tel / Fax, ect. (click here)
Lecture at Universitas Ubudiyah Indonesia is wise solutions improvement income or obtaining new jobs (please click)
Direct also these subject : Objectives Public Transportation SKS Load & Education Period Study Program + Specificity + Curriculum + Prospects Graduates All Information Excellence Selection System Candidate New College Student Lecture System and Academic Rights
Direct also these subject :   Afternoon Classes (PKSM)

In principle University of Ubudiyah Indonesia Aceh belongs to the people who always put the quality of higher education.
However, Universitas Ubudiyah Indonesia Leading the Higher Education and Accreditation still has SOCIAL COMMITMENT. Among others, to assist students in paying the cost of education by providing tuition credit facilities without interest, so the tuition fee can be paid in installments according to the ability of prospective students.

Universitas Ubudiyah Indonesia to make the cost of education is only comprised of 2 components only.

1. Development Contributions (SPb) or Money Jetty


This Development contribution can be paid in installments to:
» 46 times for high school, vocational, D3 / Polytechnic graduates, equivalent proceed to S1
» 36 times for high school graduates, SMK, equivalent proceed to D3
» 18 times for D3 / Polytechnic graduates, equivalent proceed to S1
»With the first minimum payment = IDR 300,000 to proceed to PGSD S1, Pend. Computer Science, Psychology
»With the first minimum payment = IDR 400,000 to proceed to S1 Law, T. Informatics, Information Systems, Public Health, Management, Accounting, Nutrition Sciences
»With the first minimum payment = IDR 400,000 to proceed to D3 Information Management, Computerized Accounting
»With the first minimum payment = IDR 500,000 to proceed to S1 T. Sipil, Architecture
»With the first minimum payment = IDR 600,000 to proceed to D3, Midwifery D4
»With the first minimum payment = IDR 1,000,000 to proceed to S1 Pharmacy
 

2. Contribution of Education each semester (SPP)


In this SPP includes the Principal BPP, SKS money, exam fees, and practicum money every semester. Regardless of the number of credits taken in a semester, the SPP does not change.
This SPP every semester can be repaid several times , which is the maximum installments 6 times (1 semester = 6 months) with
»First minimum payment = IDR 200,000 to proceed to the S1 Psychology Program
»First minimum payment = IDR 300,000 to proceed to the Information Management D3 Program, Computerized Accounting
»First minimum payment = IDR 300,000 to proceed to S1 Nutrition, Public Health, Management, Accounting, Information Systems, Information Systems, T.Sipil, T. Architecture, PGSD, Computer Science.
»First minimum payment = IDR 400,000 to proceed to the S1 Law Program,
»First minimum payment = IDR 400,000 to proceed to D3 Program, Midwifery D4,
»First minimum payment = IDR 500,000 to proceed to S1 Pharmacy Program,
And the rest is scheduled alone according to the installment table below.
 

Total First Payment


Total First Payment = Installment 1 for the SPb + Installment 1 for the SPP :
»IDR. (300,000 + 200,000) = IDR. 500,000 to proceed to S1 Psychology.
»IDR. (300,000 + 300,000) = IDR. 600,000 to proceed to PGSD S1, P. Computer Science.
»IDR. (400,000 + 300,000) = IDR. 700,000 to proceed to S1 Informatics, Information Systems, Nutrition Sciences, Community Health, Management, Accounting.
»IDR. (400,000 + 300,000) = IDR. 700,000 to proceed to D3 Information Management, Computerized accounting.
»IDR. (400,000 + 400,000) = IDR. 800,000 to proceed to S1 in Law, T. Sipil, Architecture.
»IDR. (600,000 + 400,000) = IDR. 1,000,000 to proceed to D3, Midwifery D4.
»IDR. (1,000,000 + 500,000) = IDR 1,500,000 to proceed to S1 Pharmacy.

The remaining installments paid in installments as the table below.


Table Installment
Development Contributions (SPb)

Entrepreneur Lecture Program Diy (Hybrid / Blended) Universitas Ubudiyah Indonesia

A.1.Table Installment SPb at Ubudiyah University Indonesia - PGSD Department and Pend. Computer Science (S1)
For high school graduates, vocational high school, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
46 x24 x12 x4x1 x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19-23
24
25-35
36
37
38-45
46
300.000
65.000
65.000
65.000
65.000
65.000
65.000
65.000
65.000
65.000
65.000
65.000
65.000
65.000
65.000
65.000
65.000
65.000
65.000
65.000
65.000
65.000
65.000
65.000
90.000
135.000
135.000
135.000
135.000
135.000
135.000
135.000
135.000
135.000
135.000
135.000
135.000
135.000
135.000
135.000
135.000
135.000
135.000
135.000
145.000
--
--
--
--
--
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
280.000
--
--
--
--
--
--
--
--
--
--
--
--
--
820.000
820.000
820.000
790.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
3.250.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.2.Table Installment SPb at Ubudiyah University Indonesia - PGSD Department and Pend. Computer Science (S1)
For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
18 x12 x7 x4 x1x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
300.000
173.000
173.000
173.000
173.000
173.000
173.000
173.000
173.000
173.000
173.000
173.000
173.000
173.000
173.000
173.000
173.000
182.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
280.000
--
--
--
--
--
--
465.000
465.000
465.000
465.000
465.000
465.000
460.000
--
--
--
--
--
--
--
--
--
--
--
820.000
820.000
820.000
790.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
3.250.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.3.Table Installment SPb at Ubudiyah University Indonesia - Department of Law (S1)
For high school graduates, vocational high school, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
46 x24 x12 x4x1 x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19-23
24
25-35
36
37
38-45
46
400.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
200.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
105.000
--
--
--
--
--
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
--
--
--
--
--
--
--
--
--
--
--
--
--
975.000
975.000
975.000
975.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
3.900.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.4.Table Installment SPb at Ubudiyah University Indonesia - Department of Law (S1)
For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
18 x12 x7 x4 x1x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
400.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
140.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
--
--
--
--
--
--
560.000
560.000
560.000
560.000
560.000
560.000
540.000
--
--
--
--
--
--
--
--
--
--
--
975.000
975.000
975.000
975.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
3.900.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.5.Table Installment SPb at Ubudiyah University Indonesia - Midwifery Department (D3)
For high school graduates, vocational high school, equivalent proceed to Bachelor Program (D3)
InstallmentThe number and amount of installments
36 x24 x12 x4x1 x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19-23
24
25-35
36
600.000
170.000
170.000
170.000
170.000
170.000
170.000
170.000
170.000
170.000
170.000
170.000
170.000
170.000
170.000
170.000
170.000
170.000
170.000
170.000
170.000
120.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
270.000
290.000
--
--
545.000
545.000
545.000
545.000
545.000
545.000
545.000
545.000
545.000
545.000
545.000
505.000
--
--
--
--
--
--
--
--
--
--
1.625.000
1.625.000
1.625.000
1.625.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
6.500.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.6.Table Installment SPb at Ubudiyah University Indonesia - Midwifery Department (D4)
For high school graduates, vocational high school, equivalent proceed to Bachelor Program (D4)
InstallmentThe number and amount of installments
46 x24 x12 x4x1 x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19-23
24
25-35
36
37
38-45
46
600.000
205.000
205.000
205.000
205.000
205.000
205.000
205.000
205.000
205.000
205.000
205.000
205.000
205.000
205.000
205.000
205.000
205.000
205.000
205.000
205.000
205.000
205.000
205.000
130.000
410.000
410.000
410.000
410.000
410.000
410.000
410.000
410.000
410.000
410.000
410.000
410.000
410.000
410.000
410.000
410.000
410.000
410.000
410.000
320.000
--
--
--
--
--
815.000
815.000
815.000
815.000
815.000
815.000
815.000
815.000
815.000
815.000
815.000
785.000
--
--
--
--
--
--
--
--
--
--
--
--
--
2.440.000
2.440.000
2.440.000
2.430.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
9.750.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.7.Table Installment SPb at Ubudiyah University Indonesia - Midwifery Department (D4)
For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (D4)
InstallmentThe number and amount of installments
18 x12 x7 x4 x1x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
600.000
540.000
540.000
540.000
540.000
540.000
540.000
540.000
540.000
540.000
540.000
540.000
540.000
540.000
540.000
540.000
540.000
510.000
815.000
815.000
815.000
815.000
815.000
815.000
815.000
815.000
815.000
815.000
815.000
785.000
--
--
--
--
--
--
1.400.000
1.400.000
1.400.000
1.400.000
1.400.000
1.400.000
1.350.000
--
--
--
--
--
--
--
--
--
--
--
2.440.000
2.440.000
2.440.000
2.430.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
9.750.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.8.Table Installment SPb at Ubudiyah University Indonesia - Department of Pharmacy (S1)
For high school graduates, vocational high school, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
46 x24 x12 x4x1 x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19-23
24
25-35
36
37
38-45
46
1.000.000
390.000
390.000
390.000
390.000
390.000
390.000
390.000
390.000
390.000
390.000
390.000
390.000
390.000
390.000
390.000
390.000
390.000
390.000
390.000
390.000
390.000
390.000
390.000
430.000
775.000
775.000
775.000
775.000
775.000
775.000
775.000
775.000
775.000
775.000
775.000
775.000
775.000
775.000
775.000
775.000
775.000
775.000
775.000
765.000
--
--
--
--
--
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.540.000
--
--
--
--
--
--
--
--
--
--
--
--
--
4.650.000
4.650.000
4.650.000
4.640.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
18.590.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.9.Table Installment SPb at Ubudiyah University Indonesia - Department of Pharmacy (S1)
For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
18 x12 x7 x4 x1x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1.000.000
1.035.000
1.035.000
1.035.000
1.035.000
1.035.000
1.035.000
1.035.000
1.035.000
1.035.000
1.035.000
1.035.000
1.035.000
1.035.000
1.035.000
1.035.000
1.035.000
1.030.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.550.000
1.540.000
--
--
--
--
--
--
2.655.000
2.655.000
2.655.000
2.655.000
2.655.000
2.655.000
2.660.000
--
--
--
--
--
--
--
--
--
--
--
4.650.000
4.650.000
4.650.000
4.640.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
18.590.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.10.Table Installment SPb at Ubudiyah University Indonesia - Department of Nutrition (S1)
For high school graduates, vocational high school, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
46 x24 x12 x4x1 x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19-23
24
25-45
46
400.000
93.000
93.000
93.000
93.000
93.000
93.000
93.000
93.000
93.000
93.000
93.000
93.000
93.000
93.000
93.000
93.000
93.000
93.000
93.000
93.000
58.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
180.000
--
--
380.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
190.000
--
--
--
--
--
--
--
--
--
--
1.140.000
1.140.000
1.140.000
1.130.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
4.550.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.11.Table Installment SPb at Ubudiyah University Indonesia - Department of Nutrition (S1)
For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
18 x12 x7 x4 x1x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
400.000
245.000
245.000
245.000
245.000
245.000
245.000
245.000
245.000
245.000
245.000
245.000
245.000
245.000
245.000
245.000
245.000
230.000
380.000
380.000
380.000
380.000
380.000
380.000
380.000
380.000
380.000
380.000
380.000
370.000
--
--
--
--
--
--
650.000
650.000
650.000
650.000
650.000
650.000
650.000
--
--
--
--
--
--
--
--
--
--
--
1.140.000
1.140.000
1.140.000
1.130.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
4.550.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.12.Table Installment SPb at Ubudiyah University Indonesia - Department of Psychology (S1)
For high school graduates, vocational high school, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
46 x24 x12 x4x1 x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19-23
24
25-45
46
300.000
85.000
85.000
85.000
85.000
85.000
85.000
85.000
85.000
85.000
85.000
85.000
85.000
85.000
85.000
85.000
85.000
85.000
85.000
85.000
85.000
120.000
175.000
175.000
175.000
175.000
175.000
175.000
175.000
175.000
175.000
175.000
175.000
175.000
175.000
175.000
175.000
175.000
175.000
175.000
175.000
135.000
--
--
345.000
345.000
345.000
345.000
345.000
345.000
345.000
345.000
345.000
345.000
345.000
365.000
--
--
--
--
--
--
--
--
--
--
1.040.000
1.040.000
1.040.000
1.040.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
4.160.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.13.Table Installment SPb at Ubudiyah University Indonesia - Department of Psychology (S1)
For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
18 x12 x7 x4 x1x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
300.000
230.000
230.000
230.000
230.000
230.000
230.000
230.000
230.000
230.000
230.000
230.000
230.000
230.000
230.000
230.000
230.000
180.000
345.000
345.000
345.000
345.000
345.000
345.000
345.000
345.000
345.000
345.000
345.000
365.000
--
--
--
--
--
--
595.000
595.000
595.000
595.000
595.000
595.000
590.000
--
--
--
--
--
--
--
--
--
--
--
1.040.000
1.040.000
1.040.000
1.040.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
4.160.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.14.Table Installment SPb at Ubudiyah University Indonesia - Department of Public Health, Management, Accounting (S1)
For high school graduates, vocational high school, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
46 x24 x12 x4x1 x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19-23
24
25-45
46
400.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
200.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
105.000
--
--
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
--
--
--
--
--
--
--
--
--
--
975.000
975.000
975.000
975.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
3.900.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.15.Table Installment SPb at Ubudiyah University Indonesia - Department of Public Health, Management, Accounting (S1)
For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
18 x12 x7 x4 x1x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
400.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
140.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
--
--
--
--
--
--
560.000
560.000
560.000
560.000
560.000
560.000
540.000
--
--
--
--
--
--
--
--
--
--
--
975.000
975.000
975.000
975.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
3.900.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.16.Table Installment SPb at Ubudiyah University Indonesia - Department of Tech. Informatics, Information Systems (S1)
For high school graduates, vocational high school, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
46 x24 x12 x4x1 x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19-23
24
25-45
46
400.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
75.000
200.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
105.000
--
--
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
--
--
--
--
--
--
--
--
--
--
975.000
975.000
975.000
975.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
3.900.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.17.Table Installment SPb at Ubudiyah University Indonesia - Department of Tech. Informatics, Information Systems (S1)
For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
18 x12 x7 x4 x1x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
400.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
210.000
140.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
--
--
--
--
--
--
560.000
560.000
560.000
560.000
560.000
560.000
540.000
--
--
--
--
--
--
--
--
--
--
--
975.000
975.000
975.000
975.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
3.900.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.18.Table Installment SPb at Ubudiyah University Indonesia - Department of Information Management, Computerized Accounting (D3)
For high school graduates, vocational high school, equivalent proceed to Bachelor Program (D3)
InstallmentThe number and amount of installments
36 x24 x12 x4x1 x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19-23
24
25-35
36
400.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
100.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
165.000
105.000
--
--
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
325.000
--
--
--
--
--
--
--
--
--
--
975.000
975.000
975.000
975.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
3.900.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.19.Table Installment SPb at Ubudiyah University Indonesia - Department of Tech. Civil, Architecture (S1)
For high school graduates, vocational high school, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
46 x24 x12 x4x1 x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19-23
24
25-45
46
500.000
105.000
105.000
105.000
105.000
105.000
105.000
105.000
105.000
105.000
105.000
105.000
105.000
105.000
105.000
105.000
105.000
105.000
105.000
105.000
105.000
80.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
220.000
140.000
--
--
440.000
440.000
440.000
440.000
440.000
440.000
440.000
440.000
440.000
440.000
440.000
360.000
--
--
--
--
--
--
--
--
--
--
1.300.000
1.300.000
1.300.000
1.300.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
5.200.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.20.Table Installment SPb at Ubudiyah University Indonesia - Department of Tech. Civil, Architecture (S1)
For D3, Polytechnic Graduates, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
18 x12 x7 x4 x1x
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
500.000
280.000
280.000
280.000
280.000
280.000
280.000
280.000
280.000
280.000
280.000
280.000
280.000
280.000
280.000
280.000
280.000
220.000
440.000
440.000
440.000
440.000
440.000
440.000
440.000
440.000
440.000
440.000
440.000
360.000
--
--
--
--
--
--
750.000
750.000
750.000
750.000
750.000
750.000
700.000
--
--
--
--
--
--
--
--
--
--
--
1.300.000
1.300.000
1.300.000
1.300.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
5.200.000
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--


A.21.Table of SPb Installments at the University of Ubudiyah Indonesia - PAUD Teacher Education Department (S1) - RPL
For graduates of SMA, SMK, D3, Polytechnic, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
8 x4 x1 x
1
2
3
4
5
6
7
8
400
000
370
000
370
000
370
000
370
000
370
000
370
000
370
000
748
000
748
000
748
000
746
000
--
--
--
--
2
990
000
--
--
--
--
--
--
--


A.22.Table of SPb Installments at the University of Ubudiyah Indonesia - Department of Information Systems & Information Engineering (S1) - RPL
For graduates of D3, Polytechnic, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
8 x4 x1 x
1
2
3
4
5
6
7
8
800.000
510.000
510.000
508.000
508.000
508.000
508.000
508.000
1
090
000
1
090
000
1
090
000
1
090
000
--
--
--
--
4
360
000
--
--
--
--
--
--
--


A.23.Table of SPb installments at the University of Ubudiyah Indonesia - Department of Pharmacy (S1) - RPL
For graduates of D3, Polytechnic, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
8 x4 x1 x
1
2
3
4
5
6
7
8
2
200
000
2
158
000
2
158
000
2
158
000
2
158
000
2
158
000
2
158
000
2
152
000)
4
325
000
4
325
000
4
325
000
4
325
000
--
--
--
--
17
300
000
--
--
--
--
--
--
--
)


A.24.Table of SPb Installments at the University of Ubudiyah Indonesia - Department of Public Health (S1) - RPL
For graduates of D3, Polytechnic, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
8 x4 x1 x
1
2
3
4
5
6
7
8
500
000
472
000
472
000
472
000
472
000
472
000
472
000
468
000
950
000
950
000
950
000
950
000
--
--
--
--
3
800
000
--
--
--
--
--
--
--


A.25.Table of SPb installments at the University of Ubudiyah Indonesia - Department of Nutrition (S1) - RPL
For graduates of D3, Polytechnic, equivalent proceed to Bachelor Program (S1)
InstallmentThe number and amount of installments
8 x4 x1 x
1
2
3
4
5
6
7
8
650
000
650
000
650
000
650
000
650
000
650
000
650
000
650
000
1
300
000
1
300
000
1
300
000
1
300
000
--
--
--
--
5
200
000
--
--
--
--
--
--
--




Table Installment
Contribution of Education each semester (SPP)

Entrepreneur Lecture Diy (Hybrid / Blended) University of Ubudiyah Indonesia Aceh

B.1.Installment Table of SPP at Ubudiyah Indonesia University - PGSD Department, Pend. Computer Science
For SMA / SMK, D3, etc. graduates, proceed to the S1 Program
InstallmentThe number and amount of installments
6 x5 x4 x3 x1 x
1
2
3
4
5
6
300.000
460.000
460.000
460.000
460.000
460.000
520.000
520.000
520.000
520.000
520.000
--
650.000
650.000
650.000
650.000
--
--
870.000
870.000
860.000
--
--
--
2.600.000
--
--
--
--
--


B.2.Installment Table of SPP at Ubudiyah University Indonesia - Department of Law
For SMA / SMK, D3, etc. graduates, proceed to the S1 Program
InstallmentThe number and amount of installments
6 x5 x4 x3 x1 x
1
2
3
4
5
6
400.000
700.000
700.000
700.000
700.000
700.000
780.000
780.000
780.000
780.000
780.000
--
975.000
975.000
975.000
975.000
--
--
1.300.000
1.300.000
1.300.000
--
--
--
3.900.000
--
--
--
--
--


B.3.Installment table for SPP at Ubudiyah Indonesia University - Midwifery Department (D3)
For high school / vocational school graduates, etc., proceed to the D3 program
InstallmentThe number and amount of installments
6 x5 x4 x3 x1 x
1
2
3
4
5
6
400.000
700.000
700.000
700.000
700.000
700.000
780.000
780.000
780.000
780.000
780.000
--
975.000
975.000
975.000
975.000
--
--
1.300.000
1.300.000
1.300.000
--
--
--
3.900.000
--
--
--
--
--


B.4.Installment Table of SPP at Ubudiyah University Indonesia - Midwifery Department (D4)
For SMA / SMK, D3, etc. graduates, proceed to Program D4
InstallmentThe number and amount of installments
6 x5 x4 x3 x1 x
1
2
3
4
5
6
400.000
1.142.000
1.142.000
1.142.000
1.142.000
1.142.000
1.222.000
1.222.000
1.222.000
1.222.000
1.222.000
--
1.530.000
1.530.000
1.530.000
1.520.000
--
--
2.040.000
2.040.000
2.030.000
--
--
--
6.110.000
--
--
--
--
--


B.5.Installment Table of SPP at Ubudiyah University Indonesia - Department of Pharmacy (S1)
For SMA / SMK, D3, etc. graduates, proceed to the S1 Program
InstallmentThe number and amount of installments
6 x5 x4 x3 x1 x
1
2
3
4
5
6
500.000
1.830.000
1.830.000
1.830.000
1.830.000
1.813.000
1.930.000
1.930.000
1.930.000
1.930.000
1.913.000
--
2.410.000
2.410.000
2.410.000
2.403.000
--
--
3.211.000
3.211.000
3.211.000
--
--
--
9.633.000
--
--
--
--
--


B.6.Installment Table of SPP at Ubudiyah University Indonesia - Department of Nutrition (S1)
For SMA / SMK, D3, etc. graduates, proceed to the S1 Program
InstallmentThe number and amount of installments
6 x5 x4 x3 x1 x
1
2
3
4
5
6
300.000
902.000
902.000
902.000
902.000
902.000
962.000
962.000
962.000
962.000
962.000
--
1.205.000
1205.000
1.205.000
1.195.000
--
--
1.800.000
1.800.000
1.210.000
--
--
--
4.810.000
--
--
--
--
--


B.7.Installment table for SPP at Ubudiyah University Indonesia - Department of Psychology (S1)
For SMA / SMK, D3, etc. graduates, proceed to the S1 Program
InstallmentThe number and amount of installments
6 x5 x4 x3 x1 x
1
2
3
4
5
6
200.000
532.000
532.000
532.000
532.000
532.000
572.000
572.000
572.000
572.000
572.000
--
715.000
715.000
715.000
715.000
--
--
955.000
955.000
950.000
--
--
--
2.860.000
--
--
--
--
--


B.8.Installment Table of SPP at Ubudiyah University Indonesia - Department of Public Health, Management, Accounting (S1)
For SMA / SMK, D3, etc. graduates, proceed to the S1 Program
InstallmentThe number and amount of installments
6 x5 x4 x3 x1 x
1
2
3
4
5
6
300.000
590.000
590.000
590.000
590.000
590.000
650.000
650.000
650.000
650.000
650.000
--
820.000
820.000
820.000
790.000
--
--
1.090.000
1.090.000
1.070.000
--
--
--
3.250.000
--
--
--
--
--


B.9.Installment Table of SPP at Ubudiyah University Indonesia - Informatics Engineering Department, Information System (S1)
For SMA / SMK, D3, etc. graduates, proceed to the S1 Program
InstallmentThe number and amount of installments
6 x5 x4 x3 x1 x
1
2
3
4
5
6
300.000
772.000
772.000
772.000
772.000
772.000
832.000
832.000
832.000
832.000
832.000
--
1.040.000
1.040.000
1.040.000
1.040.000
--
--
1.390.000
1.390.000
1.380.000
--
--
--
4.160.000
--
--
--
--
--


B.10.Installment Table of SPP at Ubudiyah University Indonesia - Department of Information Management, Computerized Accounting (D3)
For high school / vocational school graduates, etc., proceed to the D3 program
InstallmentThe number and amount of installments
6 x5 x4 x3 x1 x
1
2
3
4
5
6
300.000
590.000
590.000
590.000
590.000
590.000
650.000
650.000
650.000
650.000
650.000
--
820.000
820.000
820.000
790.000
--
--
1.090.000
1.090.000
1.070.000
--
--
--
3.250.000
--
--
--
--
--


B.11.Installment Table of SPP at Ubudiyah University Indonesia - Department of Civil Engineering, Architecture (S1)
For SMA / SMK, D3, etc. graduates, proceed to the S1 Program
InstallmentThe number and amount of installments
6 x5 x4 x3 x1 x
1
2
3
4
5
6
300.000
850.000
850.000
850.000
850.000
850.000
910.000
910.000
910.000
910.000
910.000
--
1.140.000
1.140.000
1.140.000
1.130.000
--
--
1.520.000
1.520.000
1.510.000
--
--
--
4.550.000
--
--
--
--
--


17 Hours Information Center
   
Mobile/SMS : 0811 1990 9026, 0811 1990 9028
    Tel/Fax : (021) 8762004, 8762002     WhatsApp : 0811 1990 9026
Email :  Contact Us   click here
Tags / tagged: hybrid, blended, entrepreneur, lecture, program, diy, installment, tuition, universitas, ubudiyah, indonesia, university, of, aceh, lecture program, installment tuition, ubudiyah indonesia, of ubudiyah indonesia, aceh and, accreditation, still has social, commitment among, for, d3 polytechnic graduates, equivalent proceed, to, s1, 2 contribution, of education, each, semester spp in, this, systems, information, systems t sipil, t architecture, pgsd, information systems nutrition, sciences community
Entrepreneur Lecture Program Diy (Hybrid / Blended) University of Ubudiyah Indonesia Aceh   ⌺   Quality of Higher Education A